Arup Fitzrovia

Designed by architects Sheppard Robson, the development will provide a stunning, innovative building, which will add to the character of the surrounding environment. It will replace the two 1960s buildings on the site owned by LMS and provide an additional 16,500 m2 premises for Arup’s London-based staff. 

The project team will be using Priority1 for snagging and inspections.

   

10 Lime Street

Part of ISG Group, ISG Interior/Exterior have decided to use Priority1 after also looking at BIW Technologies Defects Management and QA Software IDMS system. Their first project will be PPG Metro: Lime Street - an £18M new build project with approximately 20 sub-contractors, 2 main consultants, and a small ISG team (5 construction/technical and a project manager). There are 7 floors, 2 basements, and a ground level.

   